Commercial Interior Package
Sintered Stone Reception Desks: Front Panels, Worktops and Service Openings
Sintered stone reception desks combine public-facing panels, staff worktops, raised counters, equipment openings, access panels and lighting interfaces. One coordinated part schedule connects the design, metal frame, joinery, fabrication, packing and site installation.

Desk Zone Schedule

1. Break the Desk into Fabrication Zones
- Number straight, curved, corner and return sections.
- Separate public counters from staff worktops.
- Mark fixed panels and removable access panels.
- Identify visible ends, internal corners and external corners.
- Assign every stone piece to a frame and joinery reference.
2. Record the Material and Part Data
| Field | Front Panel | Worktop | Control Record |
|---|---|---|---|
| Product | Collection and color | Collection and color | Purchase order line |
| Finish | Visible face | Working face | Approved sample |
| Thickness | Panel value | Worktop value | Part schedule |
| Direction | Face arrow | Face arrow | Slab allocation map |
| Label | Zone and panel code | Zone and top code | Packing list |
Use the thickness guide and slab size guide when closing the part schedule.
3. Coordinate Worktop Openings
Put each opening on the fabrication drawing with finished dimensions, corner form, reference datum and equipment code. Release cutting after the equipment schedule and worktop drawing carry the same revision.

4. Control Panel Joints and Corners
Connect the layout to the countertop fabrication process and pattern-matching workflow.

5. Coordinate Lighting and Access Panels
- Mark light channels, diffuser widths and cable exits.
- Keep drivers and connection points accessible.
- Label removable panels on drawings and back faces.
- Record ventilation openings and equipment clearances.
- Separate stone joints from access-panel joints.
- Match fixing points to the approved frame and joinery details.
Add the adhesive selection page to the installation schedule.
6. Approve the Mock-Up Section
Close the sample with the quality inspection checklist and surface comparison.
Production and Packing Sequence
- Release approved desk-zone drawings and slab maps.
- Cut and finish worktops, panels, returns and closures.
- Dry-arrange visible panel groups and adjoining patterns.
- Inspect dimensions, openings, edges, faces and labels.
- Pack by zone, installation stage and part sequence.
- Issue the crate list, part photos and installation schedule.
Product Paths
Frequently Asked Questions
What belongs in the desk-zone schedule?
List the zone code, finished dimensions, material, finish, openings, joints, interfaces and part quantities.
How are curved sections controlled?
Use center points, radii, templates, chord dimensions, joint positions and orientation labels.
How are equipment openings released?
Match the equipment code to the approved worktop drawing, cable plan, frame and joinery layout.
How are removable panels identified?
Mark each panel on the elevation, back label, inspection photo, packing list and installation plan.
What closes the mock-up approval?
Close the finish, pattern, dimensions, joints, corners, openings, lighting, access and adjoining materials.
Prepare the Reception Desk RFQ
Send the desk elevations, frame and joinery drawings, equipment schedule, finish selection, quantities and delivery sequence for your sintered stone reception desks.
Request a Project Review