Column Survey Schedule
Square, rectangular, round, faceted or pilaster.
Face widths, perimeter, height, taper and vertical deviation.
Finished floor, ceiling, base, capital and adjacent wall lines.
Doors, skirting, ceilings, signage, lighting and access panels.

Panel Map
- Assign a unique panel code to every face and level.
- Place horizontal joints on approved architectural datums.
- Keep joint lines aligned across adjacent columns.
- Mark grain direction and panel rotation.
- Link every code to the cutting list and packing list.
Segmentation Approval Matrix
| Zone | Required fields | Approval record |
|---|---|---|
| Full-height face | Panel width, height, sequence, grain arrow | Elevation and cutting list |
| Base zone | Skirting return, floor joint, impact detail | Base section |
| Capital zone | Ceiling gap, trim, access clearance | Head section |
| Service zone | Device code, opening size, edge distance | Coordinated elevation |
Corners and Joints
- Corner type: mitred, butt-jointed, returned or metal-trimmed.
- Joint width, color, sealant and backing material.
- External-corner protection at traffic zones.
- Movement-joint continuity through the finish.
- Joint alignment with floors, walls and ceilings.

Openings and Fixing Package
Set-out coordinates, cutout size, corner radius and device clearance.
Material, flatness record, moisture condition and load capacity.
Adhesive, mechanical restraint, coverage and cure sequence.
Removable-panel code, release method and maintenance clearance.
Coordinate the adhesive specification, panel thickness and slab size with the approved fixing package.
Pattern and Batch Release
- Approve slab photographs with panel-code overlays.
- Lock face sequence, vein direction and column-to-column pairing.
- Record color, finish, thickness and production batch.
- Reserve matching material for replacement panels.
- Apply the batch consistency controls before cutting.

Fabrication and Installation Gate
Approved survey, elevation, slab layout and opening schedule.
Panel codes, dimensions, edge finish and dry-layout photographs.
Substrate release, datum lines, trial panel and joint sample.
Installed elevations, joint record, repairs and spare-panel register.
Use the quality inspection checklist, project specification checklist and cutting-yield schedule at the release gates.
Purchase Order Fields
Select panels from the wall decoration range, wall tile range or large-format slab range.
FAQ
Which drawing releases fabrication?
The signed column elevation, sections, panel map, opening schedule and slab layout.
How are round columns divided?
Use approved facets with coded widths, joint positions and a common vertical datum.
What controls corner appearance?
Corner type, edge finish, joint width, grain direction and installation tolerance.
How are replacement panels tracked?
Use panel codes, batch records, slab photographs, cutting files and a spare-panel register.
What is checked at handover?
Joint alignment, corner condition, panel security, surface finish, repairs and access operation.