Counter Zone Schedule
Top level, front edge, overhang, foot rail and cladding.
Service level, splashback, equipment line and access route.
Sink, tap, drain, ice well, drip tray and sealed joints.
Return panel, exposed edge, gate, wall and floor junction.

Survey and Setting-Out File
- Record finished floor and counter level datums.
- Code every straight, curved and return section.
- Mark walls, columns, service points and access panels.
- Set equipment centerlines and clearance zones.
- Transfer section codes to shop drawings and packing lists.
Worktop Approval Matrix
| Item | Required fields | Release record |
|---|---|---|
| Section | Length, width, thickness, orientation, panel code | Worktop plan |
| Seam | Position, direction, joint width, support, color | Seam map |
| Edge | Profile, build-up, return, corner and finish | Edge schedule |
| Support | Frame, bracket, substrate, fixing and access | Support drawing |
Coordinate the slab size, material thickness and edge profile with the approved worktop plan.
Equipment and Wet-Zone Openings
- Equipment code and final opening dimensions.
- Centerline, edge distance and corner radius.
- Mounting type, flange, fixing and service access.
- Tap, drain, cable and pipe penetration coordinates.
- Splashback, upstand, sealant and adjacent-joint details.
Release fabrication through the cutout approval schedule.

Front Cladding and Returns
Panel codes, joint lines, grain arrows and sequence.
Mitre, butt joint, return, trim and exposed edge.
Access doors, ventilation, lighting and service panels.
Floor, wall, foot rail, gate and equipment junctions.
Lock the slab sequence through the batch consistency workflow and calculate sections through the cutting-yield schedule.

Prototype and Dry Layout
- Assemble one approved edge and corner sample.
- Trial-fit equipment templates and access panels.
- Dry-lay worktop sections and front panels by code.
- Record seams, grain direction and color sequence.
- Sign the prototype, dry-layout photographs and packing plan.
Inspection and Installation Gate
Dimensions, openings, edges, corners and panel codes.
Support contact, seam fit, equipment fit and access.
Crate code, section list, protection and handling marks.
Joint finish, alignment, sealing, repairs and spare parts.
Close each hold point through the quality inspection checklist and adhesive specification.
Purchase Order Fields
Select material from the countertop range, full-body slab range or interior luxury series.
FAQ
What releases worktop cutting?
Signed setting-out plan, section schedule, seam map, edge schedule and opening coordinates.
What controls equipment openings?
Equipment codes, templates, centerlines, dimensions, radii, mounting and service access.
How are front panels sequenced?
Use coded elevations, slab photographs, grain arrows and a fixed installation order.
What is checked before packing?
Dimensions, openings, dry fit, surface, edges, seams, codes and protection.
What is recorded at handover?
Installed sections, joint finish, sealing, equipment fit, repairs and spare-piece register.